The CoMPAS roadmap is based on the CoMPAS product vision and the CoMPAS mission and related objectives.


Objectives per theme

ThemeNowNext Later

Specification

Build SCL based specifcations




Manual Engineering

Engineer a substation by hand




Automatic SCD generation





Testing

Test SCL files on certain aspecs




SCL insights (engineering)

Publish SCL files to get insights in to the  configurations


Protection settings "API"

Data quality settings "API"


SCL insights (scanned)

Publisch actual substation settings by scanning the substation (not with with CoMPAS) 







Disclaimer:

This roadmap is only for communication purpose. Their are no guarantees on what get delivered and when. If you like your feature to be included? Get involved in the development (directly or via a 3th party).



Please note that CoMPAS heavily relies on OpenSCD for the front-end and manual editing.

Committed:

More basic features

IED services

SCD generation

Better plug-in architecture (OpenSCD-core initiative)

CoMPAS-SCT libary


Idea's for the future:

Modbus support

61850 gateway support (61850-90-2)

More easy SCL checking

Workflow support

Single line editor

Substation logic

Integration SCD generation into front-end

(API) Service for protection settings and measurements

HMI generation (61850-6-2)

Substation logic (IEC 61850-90-11)

User rights











Functional block 

Priority rank

Comment

CoMPAS-SCT libary

1

Improve library with the ability to fully generate a substation

CoMPAS automated generation process



Integrast CoMPAS-SCT with front-end
Collaboration possible with RTE and Alliander

SCL validation with schematron


Work in progress

Schedulingnodes support



SCL file reports of testing purposes






Idea's for future development:

Modbus support

(API) Service for protection settings and measurements

HMI generation (61850-6-2)

Substation logic (IEC 61850-90-11)

User rights





Code Development Processes

Initial Roadmap Presentation

The initial roadmap of the project was drafted by a design team involving several grid operators and T&D automation vendors: 

https://github.com/com-pas/contributing/blob/master/roadmap-docs/CoMPAS%20Initial%20Roadmap%20-%20final%20version.pptx?raw=true


Roadmap status July 2022

Functional block / workstream

Priority rank

Comment

Reference architecture

1

Done, see: CoMPAS Architecture (com-pas.github.io)

System Configuration

1

Partly possible with manual steps

Testing

2

Work in progress

IEC61850-CIM mapping

2

Done

System specification

3

Done

Profiling

3

Done

For the current features, check CoMPAS - CoMPAS - LF Energy