Description

Configuration Modules for Power industry Automation Systems

The mission of LF Energy's CoMPAS project is to develop open source software components related to IEC 61850 model implementation (profile management) and configuration of a power industry Protection Automation and Control System (PACS).

The project seeks to:

  • leverage multi-vendor and multi-end-user development resources and 61850 competences to accelerate the development of common software blocks;
  • promote top-down configuration processes and common model implementation choices (thus also accelerate the conformity to IEC 61850 through software implementation);
  • deliver a production grade and reference implementation of the standard.

The project strives not to duplicate works already carried out in standardization groups. When the rules and principles from the standard are not comprehensive enough or subject to interpretation or still work in progress, the project may have to take choices for the implementation. In such case it should strive to a configurable implementation.

Technical Information

Import

From original presentation, sections:

  • Functional Scope
  • System Architecture and Technology Stack
  • Process and Priorities

Community

The idea of the communication is to be as open as possible (open governance). This allows other to trace requirements and join relevant conversations.

The LF energy slack channel will be the chat communinication channel for the CoMPAS project.

High level and generic requirements and feature will be described in the architecture documentation on Github.

Github issues will be used for technical issues and low level requirements/userstories.

The mallinglist can de be used of more formal communication:

NameDescription
CoMPAS-generalCoMPAS general discussion list
CoMPAS-announceCoMPAS Announcements
CoMPAS-devCoMPAS developers
CoMPAS-tscCoMPAS Technical Steering Committee

Maintainers

<<to be defined >>


Important Links

<< non for now >>

Regular meetings

The TSC will meet once a week.

Project Charter

The Technical charter can be found on Github.