Other use-case idea's include:

  • 61850 gateway between the substation and the central systems

South/North plugin: 61850

Concept: IEC61850-90-2


  • 61850 to 104 gateway between the substation and the central systems

North: 104

South: 61850

Concept: IEC61850-90-2 / IEC61850-80-1


  • Local validation of 61850 measurements (e.g. kirchhoff law)

South: IEC61850


  • DER agent

North: 61850

South: depends on the connect hardware

Concept of scheduling LN: IEC61850-90-7 (figure 13)


  • Part of software defined substation / centralised control and protection
  • Local configuration collection and storage (what configs are running in the substation)
  • Test local configurations
  • Collect and redispatch fault recordings
  • Ad-hoc fault recording control

...